An overall view of the new MSU football facility - March 19, 2012
A view of the southeast wall of the facility. The concrete block section is a stairway by the weight room - March 19, 2012
This is a closer view of the southeast wall - March 19, 2012
The southwest wall - March 19, 2012
The southwest wall from the opposite side of the wall - March 19, 2012
West wall of the building. Dan Mullen's office is located on the corner of the building on the 2nd floor - March 19, 2012
North wall of the building. Dan Mullen's office is on the 2nd floor and on the right side of the building - March 19, 2012
North wall on the side where the training room and weight room area will be located - March 19, 2012
This is the north wall directly by the weight room. Note the concrete blocks where the workout ramp will be located - March 19, 2012
This is the back view of where the ramp will be located - March 19, 2012
The east wall - March 19, 2012
This is the first floor where the locker room will be located - March 19, 2012
Another locker room photo - March 19, 2012
A wide angle photo of the locker room - March 19, 2012