MSU football facility being worked on - Feb 3, 2012
A view of the concrete slab where the weight room will be - Feb 3, 2012
A closer view of the steel that has been installed - Feb 3, 2012
A closer view of the second floor decking on the steel - Feb 3, 2012
A closer view of the concrete base the steel column will be placed on - Feb 3, 2012
A large steel connecting column will be installed on this concrete - Feb 3, 2012
A close-up view of one of the smaller concrete bases a steel beam will be placed on - Feb 3, 2012
A view of where the elevator is going to be - Feb 3, 2012
A closer view of the elevator - Feb 3, 2012
The three therapy pools will go here - Feb 3, 2012
A closer view of where the therapy pools will be built - Feb 3, 2012
Concrete being poured to form a grade beam. The grade beam will provide support for the concrete slab the floor will be - Feb 3, 2012
A closer view of the concrete being poured to form a grade beam. The grade beam will provide support for the concrete slab the floor will be - Feb 3, 2012
Another grade beam hole being prepared for the concrete that is about to be poured into it - Feb 3, 2012
The concrete being poured to form the grade beam - Feb 3, 2012
Concrete blocks being installed to form one of the outside walls - Feb 3, 2012
Another view of the concrete blocks being installed to form an outside wall - Feb 3, 2012